Condenser installation
You might also be interested in
Image not available
Long Beach Steam Station No. 2 and No. 3
Visual Materials
Condenser installation, stacks, south elevation poured, turbo installations, turbo room construction, boiler room construction, bricking the boilers, exterior shot complete with 8 stacks on Plant 2, control room. Piles placed for Plant 3 construction, moving above ground fuel storage tank by floating.
photCL SCE
Image not available
End of construction of Long Beach Steam Plant #1
Visual Materials
End of construction of Long Beach Steam Plant #1 - turbine installations, control rooms, transformers, cooling water system, plant start-up; and start of construction for Plant #2 - excavation, driving piles for Plant 2 foundation.
photCL SCE 13 - vol 085

Long Beach Steam Station, Plant #3 - Installing condenser in Turbo Room
Visual Materials
Long Beach Steam Station, Plant #3 - Installing condenser in Turbo Room.
photCL SCE 02 - 15008

Long Beach Steam Station, Plant #1
Visual Materials
Long Beach Steam Station, Plant #1 - Construction crew bricking up the boilers during the construction of Long Beach Steam Plant.
photCL SCE 02 - 00480

Long Beach Steam Station, Plant #1
Visual Materials
Long Beach Steam Station, Plant #1 - A construction crew working on bricking up the boilers at the Long Beach Steam Plant.
photCL SCE 02 - 00474
Image not available
Long Beach Steam Station No. 3
Visual Materials
Long Beach Steam Station No. 3 turbo installation, Boiler No. 50, laying 15" gas main, driving piles for Unit No. 11, take-off towers, towers at channel crossing, installing transformers and oil switches, switching garden, [cooling water] intake, gauge board, switchboard, station overviews, turbine deck, boiler interior, defective pump, evaporators, chemistry lab, fuel oil pump room, exciter, piles ready for steel.
photCL SCE